CVE-2026-55233 remediation guide
openresty
OpenResty is a high performance web platform. From 1.29.2.1 to before 1.29.2.5, an out-of-bounds write vulnerability exists in the upstream PROXY protocol v2 implementation. When OpenResty is configured to send PROXY protocol version 2 headers to upstream servers, constructing the header in the stream proxy protocol v2 patch can write beyond the bounds of the allocated buffer, causing the worker process to crash and resulting in a denial of service. Only configurations that explicitly enable PROXY protocol v2 for upstream connections are impacted. This issue is fixed in version 1.29.2.5.
Identify the affected asset
Confirm whether openresty is installed, record the deployed version and installation path, and identify exposed interfaces.
- Record the product name, package or appliance identifier, and installed version.
- Identify internet-facing, administrative, API, and internal access paths.
- Preserve the pre-change configuration and relevant service logs.
Validate the affected-version match
Compare the deployed version with the affected range: >= >= 1.29.2.1, < 1.29.2.5, >= 1.29.2.1 < 1.29.2.5. Treat incomplete inventory results as unresolved.
Prioritize with independent signals
The CVSS severity warrants an early asset and exposure review. Combine this signal with asset criticality, exposure, compensating controls, and business impact.
Apply supported remediation
Follow the vendor advisory or supported update path. Current fixed-version status: 1.29.2.5. Preserve configuration and rollback material before change.
Verify the result
Confirm the resulting version, service health, authentication and access paths, monitoring coverage, and relevant security logs.
- Confirm the expected version and package state.
- Run a functional health check for critical service paths.
- Review authentication, error, application, and security monitoring logs.
- Reassess exposure if the supported fix cannot be applied.
Operational boundary
This page does not replace the vendor advisory, support contract, change-management process, or recovery plan. Do not infer that an asset is unaffected from an incomplete inventory query or a missing fixed-version field.