CVE-2026-45707 remediation guide
czlonkowski n8n-mcp
n8n-MCP is an MCP server that provides AI assistants access to n8n node documentation, properties, and operations. Prior to 2.51.2, when ENABLE_MULTI_TENANT=true, the HTTP transport documents that the target n8n instance is selected per-request from x-n8n-url / x-n8n-key headers. Requests that omitted those headers — or supplied only one of them — silently fell back to the process-level N8N_API_URL / N8N_API_KEY credentials configured for the operator's own n8n instance. As a result, an authenticated MCP tenant could cause n8n management calls to execute against the operator's instance inst...
Identify the affected asset
Confirm whether czlonkowski n8n-mcp is installed, record the deployed version and installation path, and identify exposed interfaces.
- Record the product name, package or appliance identifier, and installed version.
- Identify internet-facing, administrative, API, and internal access paths.
- Preserve the pre-change configuration and relevant service logs.
Validate the affected-version match
Compare the deployed version with the affected range: >= < 2.51.2, < 2.51.2. Treat incomplete inventory results as unresolved.
Prioritize with independent signals
The CVSS severity warrants an early asset and exposure review. Combine this signal with asset criticality, exposure, compensating controls, and business impact.
Apply supported remediation
Follow the vendor advisory or supported update path. Current fixed-version status: 2.51.2. Preserve configuration and rollback material before change.
Verify the result
Confirm the resulting version, service health, authentication and access paths, monitoring coverage, and relevant security logs.
- Confirm the expected version and package state.
- Run a functional health check for critical service paths.
- Review authentication, error, application, and security monitoring logs.
- Reassess exposure if the supported fix cannot be applied.
Operational boundary
This page does not replace the vendor advisory, support contract, change-management process, or recovery plan. Do not infer that an asset is unaffected from an incomplete inventory query or a missing fixed-version field.