CVE REMEDIATION GUIDE
Review reviewHighFixed-version data available

CVE-2026-40560 remediation guide

MIYAGAWA Starman, starman

Starman versions before 0.4018 for Perl allows HTTP Request Smuggling via Improper Header Precedence. Starman incorrectly prioritizes "Content-Length" over "Transfer-Encoding: chunked" when both headers are present in an HTTP request. Per RFC 7230 3.3.3, Transfer-Encoding must take precedence. An attacker could exploit this to smuggle malicious HTTP requests via a front-end reverse proxy.

Open CVE record
ProductMIYAGAWA Starman, starman
Affected versions< 0.4018
Fixed versions0.4018
Priority basisReview · CVSS 7.5 · EPSS 0.49%
01

Identify the affected asset

Confirm whether MIYAGAWA Starman, starman is installed, record the deployed version and installation path, and identify exposed interfaces.

  • Record the product name, package or appliance identifier, and installed version.
  • Identify internet-facing, administrative, API, and internal access paths.
  • Preserve the pre-change configuration and relevant service logs.
02

Validate the affected-version match

Compare the deployed version with the affected range: < 0.4018. Treat incomplete inventory results as unresolved.

03

Prioritize with independent signals

The CVSS severity warrants an early asset and exposure review. Combine this signal with asset criticality, exposure, compensating controls, and business impact.

04

Apply supported remediation

Follow the vendor advisory or supported update path. Current fixed-version status: 0.4018. Preserve configuration and rollback material before change.

05

Verify the result

Confirm the resulting version, service health, authentication and access paths, monitoring coverage, and relevant security logs.

  • Confirm the expected version and package state.
  • Run a functional health check for critical service paths.
  • Review authentication, error, application, and security monitoring logs.
  • Reassess exposure if the supported fix cannot be applied.

Operational boundary

This page does not replace the vendor advisory, support contract, change-management process, or recovery plan. Do not infer that an asset is unaffected from an incomplete inventory query or a missing fixed-version field.