CVE-2026-23940 remediation guide
hexpm hexpm, hex.pm
Uncontrolled Resource Consumption vulnerability in hexpm hexpm/hexpm allows Excessive Allocation. Publishing an oversized package can cause Hex.pm to run out of memory while extracting the uploaded package tarball. This can terminate the affected application instance and result in a denial of service for package publishing and potentially other package-processing functionality. This issue affects hexpm: before 495f01607d3eae4aed7ad09b2f54f31ec7a7df01; hex.pm: before 2026-03-10.
Identify the affected asset
Confirm whether hexpm hexpm, hex.pm is installed, record the deployed version and installation path, and identify exposed interfaces.
- Record the product name, package or appliance identifier, and installed version.
- Identify internet-facing, administrative, API, and internal access paths.
- Preserve the pre-change configuration and relevant service logs.
Validate the affected-version match
Compare the deployed version with the affected range: >= 82911daf5f8fb2ab44f298e3ba22b90bc1ae3746 < 495f01607d3eae4aed7ad09b2f54f31ec7a7df01, < 2026-03-10, < 2026-03-09. Treat incomplete inventory results as unresolved.
Prioritize with independent signals
The CVSS severity warrants an early asset and exposure review. Combine this signal with asset criticality, exposure, compensating controls, and business impact.
Apply supported remediation
Follow the vendor advisory or supported update path. Current fixed-version status: 2026-03-09. Preserve configuration and rollback material before change.
Verify the result
Confirm the resulting version, service health, authentication and access paths, monitoring coverage, and relevant security logs.
- Confirm the expected version and package state.
- Run a functional health check for critical service paths.
- Review authentication, error, application, and security monitoring logs.
- Reassess exposure if the supported fix cannot be applied.
Operational boundary
This page does not replace the vendor advisory, support contract, change-management process, or recovery plan. Do not infer that an asset is unaffected from an incomplete inventory query or a missing fixed-version field.