CVE-2026-10686 remediation guide
zephyrproject zephyr
Zephyr's IPv6 forwarding path re-sent routed unicast packets without ever decrementing the IPv6 hop limit. Both routing branches of ipv6_route_packet() (subsys/net/ip) were affected: the explicit-route path (net_route_packet()) and the on-link cross-interface path (net_route_packet_if()). Each set the packet forwarding flag and called net_send_data() with the hop limit untouched and no expiry check. Per RFC 8200 the hop-limit decrement is the mechanism that bounds packet lifetime and terminates routing loops; without it, a device acting as an IPv6 router relays looping packets indefinitely....
Identify the affected asset
Confirm whether zephyrproject zephyr is installed, record the deployed version and installation path, and identify exposed interfaces.
- Record the product name, package or appliance identifier, and installed version.
- Identify internet-facing, administrative, API, and internal access paths.
- Preserve the pre-change configuration and relevant service logs.
Validate the affected-version match
Compare the deployed version with the affected range: >= 1.8.0 < 4.5.0. Treat incomplete inventory results as unresolved.
Prioritize with independent signals
The CVSS severity warrants an early asset and exposure review. Combine this signal with asset criticality, exposure, compensating controls, and business impact.
Apply the vendor-supported remediation
Use the linked vendor advisory and update to the supported fixed release: 4.5.0. Preserve configuration and rollback material before change.
Verify the result
Confirm the resulting version, service health, authentication and access paths, monitoring coverage, and relevant security logs.
- Confirm the expected version and package state.
- Run a functional health check for critical service paths.
- Review authentication, error, application, and security monitoring logs.
- Reassess exposure if the supported fix cannot be applied.
Operational boundary
This page does not replace the vendor advisory, support contract, change-management process, or recovery plan. Do not infer that an asset is unaffected from an incomplete inventory query or a missing fixed-version field.